Title 6701 · CA
California Code, PCC 6701.
Citation: Cal. § PCC-6701
Section: PCC-6701
California Code, PCC 6701.
skip to content
home
accessibility
FAQ
feedback
sitemap
login
x
Quick Search:
Bill Number Bill Keyword
Home
Bill Information
California Law
Publications
Other Resources
My Subscriptions
My Favorites
California Law >>
>>
Code Section
Code Section
Code: Select Code CONS BPC CIV CCP COM CORP EDC ELEC EVID FAM FIN FGC FAC GOV HNC HSC INS LAB MVC PEN PROB PCC PRC PUC RTC SHC UIC VEH WAT WIC Article:Section:
Code: Select Code All BPC CIV CCP COM CORP EDC ELEC EVID FAM FIN FGC FAC GOV HNC HSC INS LAB MVC PEN PROB PCC PRC PUC RTC SHC UIC VEH WAT WIC Section: Keyword(s):
Code Search Text Search
Up^<< Previous Next >>cross-reference chaptered billsPDF | Add To My Favorites
Search Phrase:
Code Text
Public Contract Code - PCC
DIVISION 2. GENERAL PROVISIONS [1100 - 22355] Â Â ( Division 2 enacted by Stats. 1981, Ch. 306. ) Â Â PART 1. ADMINISTRATIVE PROVISIONS [1100 - 9204] Â Â ( Heading of Part 1 added by Stats. 1982, Ch. 1120, Sec. 2. ) Â Â
CHAPTER 6.3. Construction Manager/General Contractor Authority: Department of Transportation [6700 - 6708] Â Â ( Chapter 6.3 added by Stats. 2012, Ch. 752, Sec. 1. )
  6701.  (a) The Construction Manager/General Contractor method provided by this chapter may be used by the department, but is not limited to, when it is anticipated that the Construction Manager/General Contractor method will reduce project costs or expedite project completion in a manner that is not achievable through the design-bid-build method. Notwithstanding any other law, for projects utilizing the Construction Manager/General Contractor method provided by this chapter, the department shall advertise, award, and administer the Construction Manager/General Contractor contract. The department shall not delegate the contracting authority, except for the two projects reserved for projects in the County of Riverside as provided for in paragraph (2) of subdivision (b). (b) (1) The department may use the Construction Manager/General Contractor method for projects that have construction costs greater than ten million dollars ($10,000,000). (2) Consistent with Provision 2 of Item 2660-110-0042 of Section 2.00 of the Budget Act of 2016, as amended by Chapter 7 of the Statutes of 2017, two projects shall be authorized for projects in the County of Riverside and the Riverside County Transportation Commission may use the Construction Manager/General Contractor method for these projects, with the first priority for the projects listed in that budget item. (c) On at least two-thirds of the projects delivered by the department utilizing the Construction Manager/General Contractor method provided by this chapter, the department shall use department employees or consultants under contract with the department to perform all project design and engineering services related to design required for Construction Manager/General Contractor project delivery consistent with Article XXII of the California Constitution. On all projects delivered by the department, the department shall use department employees or consultants under contract with the department to perform all construction inspection services required for Construction Manager/General Contractor project delivery consistent with Article XXII of the California Constitution. Department resources, including personnel requirements, necessary to perform all services described in this subdivision shall be included in the departmentâs capital outlay support program for workload purposes in the annual Budget Act. (d) (1) The department shall prepare and submit to the Legislature an interim report no later than July 1, 2021, that describes each Construction Manager/General Contractor project approved under this chapter as of January 1, 2021, and that provides relevant data, including, but not limited to, district, cost, the stage of completion, and estimated time to completion. The department shall also prepare and submit to the Legislature a final report, no later than July 1, 2025, that provides the same relevant data for projects that were approved under this chapter as of January 1, 2025. Both the interim and final reports shall also provide a comprehensive assessment on the effectiveness of the Construction Manager/General Contractor project delivery method relative to project cost and time savings. (2) A report to be submitted pursuant to this subdivision shall be submitted in compliance with Section 9795 of the Government Code. (Amended by Stats. 2018, Ch. 465, Sec. 3. (SB 1262) Effective January 1, 2019.)